Hot articles: Assignment Problem Modelling Under Uncertainty  ***    Developing a New Model for Portfolio Selection Problem Based on Real Conditions    ***    Scheduling Problem Under Deterioration to Minimize the Due-Date    ***    Developing an Integrated Location/Allocation/Pricing Model in Capacistated Single Allocation Hub Location Problem    ***   
   

Full text


   + Volume 1
       Issue 1

      
    + Volume 2
       Issue 1
       Issue 2
       Issue 3
       Issue 4


    + Volume 3
       Issue 1
       Issue 2
       Issue 3
       Issue 4
Journal Archive
Home
Guide for Authors
Paper Submission
Scope
Archive
Editorial Board
About IEMS
Contact Us
Full text
Full text
Full text
Full text
Full text
Full text
Full text
Full text
Full text
Full text
Designing a Plug and Play System to Improve Robots Performance

M.K. Hasan, A.S.M. Hoque, T. csiSze
Solving An Extended Model to Determine the Facility Location

N. Cinar, S. S. Ahiska
Integrating Mechatronics System with Lean Manufacturing Concepts to Improve Manufacturing Industries Performance

C. Ramamoorthy, V. Selladurai, R. Ranganathan, A. Dineshkumar
Using Productive Maintenance to Optimize Production System, Case Study: Pharmaceuticals Industry

W. M. Goriwondo, S. Mhlanga, T. Kazembe
New Methods in Business Process Improvement, Case Study: Al5083 Manufacturing Process

M. A. M. Hossain, K. Y. Park, S. T. Hong
Optimization of Redesign Process in Production Systems

F. Musharavati
Optimiztion in Supply Chain with JIT Environment,
A Rotational Cyclic Policy 

R. Bhaba, P. Biswas
Developing a Reliable Mathematical Cost Estimation Model

M. Elhadie, A. N. Mustafizul Karim, A. K. M. Nurul Amin
Developing a Mathematical Model to Determine the Surface Roughness

N. T. Chowdhur, N. R. Dhar
An Extended Mixed Integer Programming Model for Optima Pricng and Capacity Allocation

S. A. Reza, A. Y. Al-Kuwari, F. A. Aloqayli
An Integrated Planning Mechanism for Supply Chain Management with Routing Subproblem

R. SatoY. Matsui, M. Furukado